Unbox & Verify Equipment Shipped

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Whether the equipment was shipped directly to site or to you, the technician, it is important to go through boxes and make sure that the products you have match the Packing Slip and the Scope of Work Document from the work order.

[What to do if anything is missing? Any common “mistakes” folks make when verifying equipment (thinking something isn’t there that is? Is there an easy way to check for the HD in the NVR? or should be put something here letting them know they’ll do this as part of the MDF / Setting up the NVR step?]


Up Next: MDFs, IDFs and Head-end Equipment